The Anchorage Apartments are replacing their lifts.


Work is scheduled to start on the 10th February until the 21st of April 2023.

LIFT ACCESS WILL ALWAYS BE AVAILABLE TO LEVEL TWO, as the north and south tower are connected via the pool area. ONE tower will be worked on at a time.

Level 3 and 4 will be access by stairs only on the side that work is being carried out.

There may be industrial noise from 9 to 4 30.

Please Note: Anchorage Apartments are replacing their lifts, Read More

×